Friday, July 5, 2013

Mews Completion

Here are the pictures with little comment
 Food chute and pass through window for cross ventilation.


 
Infra red color camera connected to DVR and monitor in house.


 Electricity to the shed.
 
 Ready for switches and lights.
 
Inspection items, leash, bath pan, jesses, anklet materials, and swivels. Interlocking foam pads on concrete floor to protect talons. Walls and ceiling covered with Coroplast (imagine plastic cardboard, like political signs.) Smooth and power washable. 
Food chute platform. Coroplast is easy to clean.

 
Roof completed.
Vent holes for air movement in each rafter bay.

 Installing light baffles on shutters.
 
 Light tight shutters
 
 1 inch foam on top of sheathing and tar paper, covered by aluminum.
 
Painted, soffit and facia. All gaps foamed.

No comments:

Post a Comment